AS Construction
Call us any time 0261-4017946
Call us any time 0261-4017946

Team

Arvind Kumar Singh

Managing Director

Arvind Kumar Singh

Managing Director
<h1> Arvind Kumar Singh </h1 > <a property="item" typeof="WebPage" title="Go to AS Construction." href="https://as-construction.org" >AS Construction</a><meta property="position" content="1"> > <a property="item" typeof="WebPage" title="Go to Blog." href="https://as-construction.org/blog/" aria-current="page">Blog</a><meta property="position" content="2"> <img width="935" height="768" src="https://as-construction.org/wp-content/uploads/2026/01/AKSingh.jpeg" alt="" decoding="async" srcset="https://as-construction.org/wp-content/uploads/2026/01/AKSingh.jpeg 935w, https://as-construction.org/wp-content/uploads/2026/01/AKSingh-300x246.jpeg 300w, https://as-construction.org/wp-content/uploads/2026/01/AKSingh-768x631.jpeg 768w" sizes="(max-width: 935px) 100vw, 935px" /> <h2>Hi, I am <br>Arvind Kumar Singh</h2> Managing Director <p>When I established M/S A.S. Construction, I envisioned a company that would do more than just execute engineering projects. I wanted to build a legacy of reliability and excellence in India’s core industrial sectors. Starting as a dedicated proprietorship, our journey has been defined by a simple but inflexible philosophy: transparency, fairness, and an unwavering commitment to our clients' success.</p><p data-path-to-node="5">My approach to leadership is centered on two pillars: </p><p data-path-to-node="5"><b data-path-to-node="5,0" data-index-in-node="55">People and Performance.</b> <b data-path-to-node="5,0" data-index-in-node="81">Our People:</b> I believe our greatest asset is our workforce. Today, I lead a full-fledged team of over 1000 skilled professionals who are the backbone of every project we undertake. We invest heavily in their safety and professional growth, ensuring they are equipped to handle complex challenges at a moment’s notice.</p><p data-path-to-node="6,0,1"><b data-path-to-node="6,0,1,0" data-index-in-node="0">Our Performance:</b> In an industry where time is as valuable as quality, I have made it our mission to excel in critical, time-bound shutdowns and complex fabrication tasks. Whether we are working with industry giants like ArcelorMittal Nippon Steel or the Adani Group, my goal remains the same: to deliver high-quality standards, with safety as our first priority and to deliver value and satisfaction through honest, innovative engineering.</p><p data-path-to-node="7">Looking ahead, my vision is to see A.S. Construction become a leading major contractor in mechanical services. We will continue to expand our scope, embrace new challenges with due diligence, and maintain the strategic partnerships that have brought us this far.</p><p data-path-to-node="8">Thank you for being part of our story.</p><p data-path-to-node="10"><b data-path-to-node="10,0" data-index-in-node="0">Arvind Kumar Singh</b></p><p data-path-to-node="10">Managing Director, </p><p data-path-to-node="10">M/S A.S. Construction</p> <h3>25+ Years Experience</h3> <ul> <li> <svg aria-hidden="true" viewBox="0 0 512 512" xmlns="http://www.w3.org/2000/svg"><path d="M504 256c0 136.967-111.033 248-248 248S8 392.967 8 256 119.033 8 256 8s248 111.033 248 248zM227.314 387.314l184-184c6.248-6.248 6.248-16.379 0-22.627l-22.627-22.627c-6.248-6.249-16.379-6.249-22.628 0L216 308.118l-70.059-70.059c-6.248-6.248-16.379-6.248-22.628 0l-22.627 22.627c-6.248 6.248-6.248 16.379 0 22.627l104 104c6.249 6.249 16.379 6.249 22.628.001z"></path></svg> Valued for their warm and transparent communication </li> </ul> <ul> <li> <svg aria-hidden="true" viewBox="0 0 512 512" xmlns="http://www.w3.org/2000/svg"><path d="M504 256c0 136.967-111.033 248-248 248S8 392.967 8 256 119.033 8 256 8s248 111.033 248 248zM227.314 387.314l184-184c6.248-6.248 6.248-16.379 0-22.627l-22.627-22.627c-6.248-6.249-16.379-6.249-22.628 0L216 308.118l-70.059-70.059c-6.248-6.248-16.379-6.248-22.628 0l-22.627 22.627c-6.248 6.248-6.248 16.379 0 22.627l104 104c6.249 6.249 16.379 6.249 22.628.001z"></path></svg> Known for their approachable style and clear communication. </li> </ul> <h3>Contact Me</h3> <!-- Style 1 Start --> Email: <a href="mailto:ak.singh@as-construction.org">ak.singh@as-construction.org</a> <!-- Style 1 End --> <ul> <li><a href="#"> <svg aria-hidden="true" viewBox="0 0 320 512" xmlns="http://www.w3.org/2000/svg"><path d="M279.14 288l14.22-92.66h-88.91v-60.13c0-25.35 12.42-50.06 52.24-50.06h40.42V6.26S260.43 0 225.36 0c-73.22 0-121.08 44.38-121.08 124.72v70.62H22.89V288h81.39v224h100.17V288z"></path></svg> </a> </li> <li><a href="#"> <svg aria-hidden="true" viewBox="0 0 448 512" xmlns="http://www.w3.org/2000/svg"><path d="M224.1 141c-63.6 0-114.9 51.3-114.9 114.9s51.3 114.9 114.9 114.9S339 319.5 339 255.9 287.7 141 224.1 141zm0 189.6c-41.1 0-74.7-33.5-74.7-74.7s33.5-74.7 74.7-74.7 74.7 33.5 74.7 74.7-33.6 74.7-74.7 74.7zm146.4-194.3c0 14.9-12 26.8-26.8 26.8-14.9 0-26.8-12-26.8-26.8s12-26.8 26.8-26.8 26.8 12 26.8 26.8zm76.1 27.2c-1.7-35.9-9.9-67.7-36.2-93.9-26.2-26.2-58-34.4-93.9-36.2-37-2.1-147.9-2.1-184.9 0-35.8 1.7-67.6 9.9-93.9 36.1s-34.4 58-36.2 93.9c-2.1 37-2.1 147.9 0 184.9 1.7 35.9 9.9 67.7 36.2 93.9s58 34.4 93.9 36.2c37 2.1 147.9 2.1 184.9 0 35.9-1.7 67.7-9.9 93.9-36.2 26.2-26.2 34.4-58 36.2-93.9 2.1-37 2.1-147.8 0-184.8zM398.8 388c-7.8 19.6-22.9 34.7-42.6 42.6-29.5 11.7-99.5 9-132.1 9s-102.7 2.6-132.1-9c-19.6-7.8-34.7-22.9-42.6-42.6-11.7-29.5-9-99.5-9-132.1s-2.6-102.7 9-132.1c7.8-19.6 22.9-34.7 42.6-42.6 29.5-11.7 99.5-9 132.1-9s102.7-2.6 132.1 9c19.6 7.8 34.7 22.9 42.6 42.6 11.7 29.5 9 99.5 9 132.1s2.7 102.7-9 132.1z"></path></svg> </a> </li> <li><a href="#"> <svg aria-hidden="true" viewBox="0 0 512 512" xmlns="http://www.w3.org/2000/svg"><path d="M389.2 48h70.6L305.6 224.2 487 464H345L233.7 318.6 106.5 464H35.8L200.7 275.5 26.8 48H172.4L272.9 180.9 389.2 48zM364.4 421.8h39.1L151.1 88h-42L364.4 421.8z"></path></svg> </a> </li> <li><a href="#"> <svg aria-hidden="true" viewBox="0 0 448 512" xmlns="http://www.w3.org/2000/svg"><path d="M100.28 448H7.4V148.9h92.88zM53.79 108.1C24.09 108.1 0 83.5 0 53.8a53.79 53.79 0 0 1 107.58 0c0 29.7-24.1 54.3-53.79 54.3zM447.9 448h-92.68V302.4c0-34.7-.7-79.2-48.29-79.2-48.29 0-55.69 37.7-55.69 76.7V448h-92.78V148.9h89.08v40.8h1.3c12.4-23.5 42.69-48.3 87.88-48.3 94 0 111.28 61.9 111.28 142.3V448z"></path></svg> </a> </li> </ul>

Pawan Kumar Singh

Project Co-ordinator

Pawan Kumar Singh

Project Co-ordinator
<h1> Pawan Kumar Singh </h1 > <a property="item" typeof="WebPage" title="Go to AS Construction." href="https://as-construction.org" >AS Construction</a><meta property="position" content="1"> > <a property="item" typeof="WebPage" title="Go to Blog." href="https://as-construction.org/blog/" aria-current="page">Blog</a><meta property="position" content="2"> <img width="935" height="768" src="https://as-construction.org/wp-content/uploads/2026/01/PKSingh.jpg" alt="" decoding="async" srcset="https://as-construction.org/wp-content/uploads/2026/01/PKSingh.jpg 935w, https://as-construction.org/wp-content/uploads/2026/01/PKSingh-300x246.jpg 300w, https://as-construction.org/wp-content/uploads/2026/01/PKSingh-768x631.jpg 768w" sizes="(max-width: 935px) 100vw, 935px" /> <h2>Hi, I am <br>Pawan Kumar Singh</h2> Project Co-ordinator <p data-start="220" data-end="507">My journey with <strong data-start="236" data-end="261">M/S A.S. Construction</strong> has been one of turning complex engineering blueprints into industrial reality. As the <strong data-start="349" data-end="373">Project Co-ordinator</strong>, my focus is not just on the scale of our projects, but on the precision, coordination, and technical integrity that define our name.</p><p data-start="903" data-end="1251">A key part of my role involves coordinating project activities to ensure timely execution within defined <strong data-start="1008" data-end="1046">scope, cost, and quality standards</strong>. I continuously monitor project schedules, resources, and documentation to support efficient delivery, while ensuring full compliance with <strong data-start="1186" data-end="1235">safety, quality, and contractual requirements</strong> at every stage.</p><p data-start="1253" data-end="1714">From the fabrication and erection of heavy static equipment to the precise alignment of piping and structures, our standards remain uncompromised. Collaborations with leading clients such as <strong data-start="1598" data-end="1628">ArcelorMittal Nippon Steel</strong> and <strong data-start="1633" data-end="1648">Adani Group</strong> have reinforced our commitment to world-class quality and safety.</p><p data-start="1716" data-end="2077">What makes my role truly rewarding is seeing our <strong data-start="1765" data-end="1786">one-stop solution</strong> approach in action—taking projects from initial design coordination through execution, testing, and commissioning. I remain committed to strengthening team spirit, refining technical competence, and ensuring that every project is delivered efficiently, safely, and to the highest standards.</p><p data-start="2079" data-end="2295">As we look to the future, my goal is to continue enhancing our technical capabilities and resource strength, ensuring that <strong data-start="2202" data-end="2223">A.S. Construction</strong> remains the preferred partner for major industrial mechanical services.</p><p data-start="2297" data-end="2371"><strong data-start="2297" data-end="2318">Pawan Kumar Singh</strong><br data-start="2318" data-end="2321" /><em data-start="2321" data-end="2343">Project Co-ordinator</em></p><p data-start="2297" data-end="2371"><strong data-start="2346" data-end="2371">M/S A.S. Construction</strong></p> <h3>25+ Years Experience</h3> <ul> <li> <svg aria-hidden="true" viewBox="0 0 512 512" xmlns="http://www.w3.org/2000/svg"><path d="M504 256c0 136.967-111.033 248-248 248S8 392.967 8 256 119.033 8 256 8s248 111.033 248 248zM227.314 387.314l184-184c6.248-6.248 6.248-16.379 0-22.627l-22.627-22.627c-6.248-6.249-16.379-6.249-22.628 0L216 308.118l-70.059-70.059c-6.248-6.248-16.379-6.248-22.628 0l-22.627 22.627c-6.248 6.248-6.248 16.379 0 22.627l104 104c6.249 6.249 16.379 6.249 22.628.001z"></path></svg> Valued for their warm and transparent communication </li> </ul> <ul> <li> <svg aria-hidden="true" viewBox="0 0 512 512" xmlns="http://www.w3.org/2000/svg"><path d="M504 256c0 136.967-111.033 248-248 248S8 392.967 8 256 119.033 8 256 8s248 111.033 248 248zM227.314 387.314l184-184c6.248-6.248 6.248-16.379 0-22.627l-22.627-22.627c-6.248-6.249-16.379-6.249-22.628 0L216 308.118l-70.059-70.059c-6.248-6.248-16.379-6.248-22.628 0l-22.627 22.627c-6.248 6.248-6.248 16.379 0 22.627l104 104c6.249 6.249 16.379 6.249 22.628.001z"></path></svg> Known for their approachable style and clear communication. </li> </ul> <h3>Contact Me</h3> <!-- Style 1 Start --> Email: <a href="mailto:pawan.singh@as-construction.org">pawan.singh@as-construction.org</a> <!-- Style 1 End --> <ul> <li><a href="#"> <svg aria-hidden="true" viewBox="0 0 320 512" xmlns="http://www.w3.org/2000/svg"><path d="M279.14 288l14.22-92.66h-88.91v-60.13c0-25.35 12.42-50.06 52.24-50.06h40.42V6.26S260.43 0 225.36 0c-73.22 0-121.08 44.38-121.08 124.72v70.62H22.89V288h81.39v224h100.17V288z"></path></svg> </a> </li> <li><a href="#"> <svg aria-hidden="true" viewBox="0 0 448 512" xmlns="http://www.w3.org/2000/svg"><path d="M224.1 141c-63.6 0-114.9 51.3-114.9 114.9s51.3 114.9 114.9 114.9S339 319.5 339 255.9 287.7 141 224.1 141zm0 189.6c-41.1 0-74.7-33.5-74.7-74.7s33.5-74.7 74.7-74.7 74.7 33.5 74.7 74.7-33.6 74.7-74.7 74.7zm146.4-194.3c0 14.9-12 26.8-26.8 26.8-14.9 0-26.8-12-26.8-26.8s12-26.8 26.8-26.8 26.8 12 26.8 26.8zm76.1 27.2c-1.7-35.9-9.9-67.7-36.2-93.9-26.2-26.2-58-34.4-93.9-36.2-37-2.1-147.9-2.1-184.9 0-35.8 1.7-67.6 9.9-93.9 36.1s-34.4 58-36.2 93.9c-2.1 37-2.1 147.9 0 184.9 1.7 35.9 9.9 67.7 36.2 93.9s58 34.4 93.9 36.2c37 2.1 147.9 2.1 184.9 0 35.9-1.7 67.7-9.9 93.9-36.2 26.2-26.2 34.4-58 36.2-93.9 2.1-37 2.1-147.8 0-184.8zM398.8 388c-7.8 19.6-22.9 34.7-42.6 42.6-29.5 11.7-99.5 9-132.1 9s-102.7 2.6-132.1-9c-19.6-7.8-34.7-22.9-42.6-42.6-11.7-29.5-9-99.5-9-132.1s-2.6-102.7 9-132.1c7.8-19.6 22.9-34.7 42.6-42.6 29.5-11.7 99.5-9 132.1-9s102.7-2.6 132.1 9c19.6 7.8 34.7 22.9 42.6 42.6 11.7 29.5 9 99.5 9 132.1s2.7 102.7-9 132.1z"></path></svg> </a> </li> <li><a href="#"> <svg aria-hidden="true" viewBox="0 0 512 512" xmlns="http://www.w3.org/2000/svg"><path d="M389.2 48h70.6L305.6 224.2 487 464H345L233.7 318.6 106.5 464H35.8L200.7 275.5 26.8 48H172.4L272.9 180.9 389.2 48zM364.4 421.8h39.1L151.1 88h-42L364.4 421.8z"></path></svg> </a> </li> <li><a href="#"> <svg aria-hidden="true" viewBox="0 0 448 512" xmlns="http://www.w3.org/2000/svg"><path d="M100.28 448H7.4V148.9h92.88zM53.79 108.1C24.09 108.1 0 83.5 0 53.8a53.79 53.79 0 0 1 107.58 0c0 29.7-24.1 54.3-53.79 54.3zM447.9 448h-92.68V302.4c0-34.7-.7-79.2-48.29-79.2-48.29 0-55.69 37.7-55.69 76.7V448h-92.78V148.9h89.08v40.8h1.3c12.4-23.5 42.69-48.3 87.88-48.3 94 0 111.28 61.9 111.28 142.3V448z"></path></svg> </a> </li> </ul>

Ranjan Kumar Singh

Deputy Manager (Accounts & Finance)

Ranjan Kumar Singh

Deputy Manager (Accounts & Finance)
<h1> Ranjan Kumar Singh </h1 > <a property="item" typeof="WebPage" title="Go to AS Construction." href="https://as-construction.org" >AS Construction</a><meta property="position" content="1"> > <a property="item" typeof="WebPage" title="Go to Blog." href="https://as-construction.org/blog/" aria-current="page">Blog</a><meta property="position" content="2"> <img width="935" height="768" src="https://as-construction.org/wp-content/uploads/2026/01/RanjanSingh.jpg" alt="" decoding="async" srcset="https://as-construction.org/wp-content/uploads/2026/01/RanjanSingh.jpg 935w, https://as-construction.org/wp-content/uploads/2026/01/RanjanSingh-300x246.jpg 300w, https://as-construction.org/wp-content/uploads/2026/01/RanjanSingh-768x631.jpg 768w" sizes="(max-width: 935px) 100vw, 935px" /> <h2>Hi, I am <br>Ranjan Kumar Singh</h2> Deputy Manager (Accounts & Finance) <p data-path-to-node="3">With over 15 years in the field, I’ve learned that a project is only as strong as the accounting foundation supporting it. I take pride in being the person who ensures that while our engineers are on the ground, the "financial gears" are turning perfectly in the background.</p><p data-path-to-node="4"><b data-path-to-node="4" data-index-in-node="0">Here is a snapshot of how I support our operations:</b></p><ul data-path-to-node="5"><li><p data-path-to-node="5,0,0"><b data-path-to-node="5,0,0" data-index-in-node="0">Handling the Full Financial Spectrum:</b> I manage all the company's accounting requirements—from daily ledger entries and large-scale payroll for our workers to the finalization of our annual balance sheets. No detail is too small for my team to track.</p></li><li><p data-path-to-node="5,1,0"><b data-path-to-node="5,1,0" data-index-in-node="0">Expert Tax Solutions:</b> Taxation in the construction sector can be complex, but I specialize in making it seamless. I handle all GST, TDS, and Income Tax matters efficiently, ensuring we stay 100% compliant with government regulations while optimizing our tax positions.</p></li><li><p data-path-to-node="5,2,0"><b data-path-to-node="5,2,0" data-index-in-node="0">Budgetary Oversight:</b> I work closely with our project managers to monitor costs for our work orders. My focus is on resource efficiency—making sure every rupee is accounted for and utilized to its maximum potential.</p></li><li><p data-path-to-node="5,3,0"><b data-path-to-node="5,3,0" data-index-in-node="0">Audit & Compliance Leadership:</b> I personally oversee our internal and external audits. My goal is to maintain a "Zero-Error" financial record, which gives our Tier-1 clients like <b data-path-to-node="5,3,0" data-index-in-node="178">AM/NS</b> and <b data-path-to-node="5,3,0" data-index-in-node="188">JSW</b> total confidence in our professional integrity.</p></li><li><p data-path-to-node="5,4,0"><b data-path-to-node="5,4,0" data-index-in-node="0">Requirement Fulfillment:</b> Whether it's vendor management, statutory labor filings, or banking relations, I am dedicated to fulfilling every financial requirement of the company with speed and accuracy.</p></li></ul> <h3>15+ Years Experience</h3> <ul> <li> <svg aria-hidden="true" viewBox="0 0 512 512" xmlns="http://www.w3.org/2000/svg"><path d="M504 256c0 136.967-111.033 248-248 248S8 392.967 8 256 119.033 8 256 8s248 111.033 248 248zM227.314 387.314l184-184c6.248-6.248 6.248-16.379 0-22.627l-22.627-22.627c-6.248-6.249-16.379-6.249-22.628 0L216 308.118l-70.059-70.059c-6.248-6.248-16.379-6.248-22.628 0l-22.627 22.627c-6.248 6.248-6.248 16.379 0 22.627l104 104c6.249 6.249 16.379 6.249 22.628.001z"></path></svg> Valued for their warm and transparent communication </li> </ul> <ul> <li> <svg aria-hidden="true" viewBox="0 0 512 512" xmlns="http://www.w3.org/2000/svg"><path d="M504 256c0 136.967-111.033 248-248 248S8 392.967 8 256 119.033 8 256 8s248 111.033 248 248zM227.314 387.314l184-184c6.248-6.248 6.248-16.379 0-22.627l-22.627-22.627c-6.248-6.249-16.379-6.249-22.628 0L216 308.118l-70.059-70.059c-6.248-6.248-16.379-6.248-22.628 0l-22.627 22.627c-6.248 6.248-6.248 16.379 0 22.627l104 104c6.249 6.249 16.379 6.249 22.628.001z"></path></svg> Known for their approachable style and clear communication. </li> </ul> <h3>Contact Me</h3> <!-- Style 1 Start --> Email: <a href="mailto:ranjan.singh@as-construction.org">ranjan.singh@as-construction.org</a> <!-- Style 1 End --> <ul> <li><a href="#"> <svg aria-hidden="true" viewBox="0 0 320 512" xmlns="http://www.w3.org/2000/svg"><path d="M279.14 288l14.22-92.66h-88.91v-60.13c0-25.35 12.42-50.06 52.24-50.06h40.42V6.26S260.43 0 225.36 0c-73.22 0-121.08 44.38-121.08 124.72v70.62H22.89V288h81.39v224h100.17V288z"></path></svg> </a> </li> <li><a href="#"> <svg aria-hidden="true" viewBox="0 0 448 512" xmlns="http://www.w3.org/2000/svg"><path d="M224.1 141c-63.6 0-114.9 51.3-114.9 114.9s51.3 114.9 114.9 114.9S339 319.5 339 255.9 287.7 141 224.1 141zm0 189.6c-41.1 0-74.7-33.5-74.7-74.7s33.5-74.7 74.7-74.7 74.7 33.5 74.7 74.7-33.6 74.7-74.7 74.7zm146.4-194.3c0 14.9-12 26.8-26.8 26.8-14.9 0-26.8-12-26.8-26.8s12-26.8 26.8-26.8 26.8 12 26.8 26.8zm76.1 27.2c-1.7-35.9-9.9-67.7-36.2-93.9-26.2-26.2-58-34.4-93.9-36.2-37-2.1-147.9-2.1-184.9 0-35.8 1.7-67.6 9.9-93.9 36.1s-34.4 58-36.2 93.9c-2.1 37-2.1 147.9 0 184.9 1.7 35.9 9.9 67.7 36.2 93.9s58 34.4 93.9 36.2c37 2.1 147.9 2.1 184.9 0 35.9-1.7 67.7-9.9 93.9-36.2 26.2-26.2 34.4-58 36.2-93.9 2.1-37 2.1-147.8 0-184.8zM398.8 388c-7.8 19.6-22.9 34.7-42.6 42.6-29.5 11.7-99.5 9-132.1 9s-102.7 2.6-132.1-9c-19.6-7.8-34.7-22.9-42.6-42.6-11.7-29.5-9-99.5-9-132.1s-2.6-102.7 9-132.1c7.8-19.6 22.9-34.7 42.6-42.6 29.5-11.7 99.5-9 132.1-9s102.7-2.6 132.1 9c19.6 7.8 34.7 22.9 42.6 42.6 11.7 29.5 9 99.5 9 132.1s2.7 102.7-9 132.1z"></path></svg> </a> </li> <li><a href="#"> <svg aria-hidden="true" viewBox="0 0 512 512" xmlns="http://www.w3.org/2000/svg"><path d="M389.2 48h70.6L305.6 224.2 487 464H345L233.7 318.6 106.5 464H35.8L200.7 275.5 26.8 48H172.4L272.9 180.9 389.2 48zM364.4 421.8h39.1L151.1 88h-42L364.4 421.8z"></path></svg> </a> </li> <li><a href="#"> <svg aria-hidden="true" viewBox="0 0 448 512" xmlns="http://www.w3.org/2000/svg"><path d="M100.28 448H7.4V148.9h92.88zM53.79 108.1C24.09 108.1 0 83.5 0 53.8a53.79 53.79 0 0 1 107.58 0c0 29.7-24.1 54.3-53.79 54.3zM447.9 448h-92.68V302.4c0-34.7-.7-79.2-48.29-79.2-48.29 0-55.69 37.7-55.69 76.7V448h-92.78V148.9h89.08v40.8h1.3c12.4-23.5 42.69-48.3 87.88-48.3 94 0 111.28 61.9 111.28 142.3V448z"></path></svg> </a> </li> </ul>

Sanjay Narke

Technical Consultant & Business Development

Sanjay Narke

Technical Consultant & Business Development
<h1>Sanjay Narke </h1 > <a title="Go to AS Construction." href="https://as-construction.org">AS Construction</a>> <a title="Go to Blog." href="https://as-construction.org/blog/" aria-current="page">Blog</a> <img src="https://as-construction.org/wp-content/uploads/2026/01/SanjayNarke.jpg" sizes="(max-width: 935px) 100vw, 935px" srcset="https://as-construction.org/wp-content/uploads/2026/01/SanjayNarke.jpg 935w, https://as-construction.org/wp-content/uploads/2026/01/SanjayNarke-300x246.jpg 300w, https://as-construction.org/wp-content/uploads/2026/01/SanjayNarke-768x631.jpg 768w" alt="" width="935" height="768" /></h1> <h2>Hi, I am Sanjay Narke</h2> Technical Consultant & Business Development <p data-path-to-node="7"><b data-path-to-node="7" data-index-in-node="0">Engineering with Integrity, Executing with Precision</b> In my capacity as Technical Consultant, my goal is to train and develop skills, and to improve the level of technical competence at every level of management. I oversee the strategic framework of our operations. My work ensures that our workforce of 1000+ skilled professionals operates with the technical clarity needed to meet the demanding standards of Refineries, Steel Plants, and Power complexes.</p> <p data-path-to-node="8"><b data-path-to-node="8" data-index-in-node="0">Where I Focus My Expertise:</b></p> <ul data-path-to-node="9"> <li> <p data-path-to-node="9,0,0"><b data-path-to-node="9,0,0" data-index-in-node="0">Strategic Project Engineering:</b> I design the execution roadmaps for our most complex mechanical and structural projects. I ensure that our technical approach is optimized for both speed and structural stability.</p> </li> <li> <p data-path-to-node="9,1,0"><b data-path-to-node="9,1,0" data-index-in-node="0">Safety & HSE Leadership:</b> I believe that no project is successful unless it is safe. I personally oversee the implementation of our rigorous Health, Safety, and Environment (HSE) protocols to protect our team and your assets.</p> </li> <li> <p data-path-to-node="9,2,0"><b data-path-to-node="9,2,0" data-index-in-node="0">High-Stakes Problem Solving:</b> From the intricate alignment of rotary equipment to the structural integrity of heavy-duty fabrication, I provide the technical solutions needed to overcome site-specific hurdles in real-time.</p> </li> <li> <p data-path-to-node="9,3,0"><b data-path-to-node="9,3,0" data-index-in-node="0">Quality Assurance & Compliance:</b> I act as the final check for technical excellence. My goal is to ensure that every weld, joint, and structural erection meets or exceeds international engineering codes and client specifications.</p> </li> <li> <p data-path-to-node="9,4,0"><b data-path-to-node="9,4,0" data-index-in-node="0">Workforce Mobilization:</b> I leverage our massive resource pool to ensure we have the right technical "muscle" in the right place, specifically for time-bound, critical plant shutdowns where every hour counts.</p> </li> </ul> <h3>34+ Years Experience</h3> <ul> <li> Valued for their warm and transparent communication</li> </ul> <ul> <li> Known for their approachable style and clear communication.</li> </ul> <h3>Contact Me</h3> <!-- Style 1 Start --> Email: <a href="mailto:sanjay.narke@as-construction.org">sanjay.narke@as-construction.org</a> <!-- Style 1 End --> <ul> <li><a href="#"> </a></li> <li><a href="#"> </a></li> <li><a href="#"> </a></li> <li><a href="#"> </a></li> </ul>